Purpose-built risk assessment platform for utility-scale and commercial solar farms. 88 checklist items across 11 domains covering PV panel condition, inverter systems, electrical safety, lightning protection, grid interconnection, and O&M compliance—with AI-powered analysis and professional PDF reporting.
From field assessment to boardroom-ready PDF reports—SiteShield handles the entire workflow with industry-specific precision.
Structured thermal imaging workflows to identify hot spots, bypass diode failures, and cell degradation. IV curve measurement checklists aligned to IEC 62446-3 and IEA PVPS best practice.
Claude Opus AI analyses all 11 domains simultaneously — generating risk scores, standards gap analysis with IEC/NEC clause citations, and prioritised remediation plans with cost estimates.
Comprehensive IEEE 1547-2018 assessment: anti-islanding verification, fault ride-through settings, reactive power capability, and protection relay coordination documentation.
Full (35–40 pages), Executive (4–6 pages), and Technical (15–25 pages) reports in under 60 seconds — with photographic evidence, thermal scan findings, and standards citations.
Complete DC/AC wiring review, rapid shutdown system testing, arc flash hazard analysis, GFDI device verification, and insulation resistance testing — NEC 690 and NFPA 70E aligned.
Verify operating permits, SWPPP currency, PPA compliance status, warranty tracking, as-built accuracy, and business continuity plan completeness.
Every domain is mapped to applicable industry standards and weighted by operational criticality per ISO 31000:2018.
Thermal scanning protocols, IV curve tracing, hot spot identification (>10°C delta), junction box integrity, leading edge erosion — IEC 62446-3, IEC 61215
DC wiring UV rating, rapid shutdown compliance (NEC 690.12), GFDI devices, arc flash study, insulation resistance (Megger) — NEC 690, NFPA 70E
Ground resistance <25 ohms, IEC 62305 LPS risk assessment, Type 1/2 SPDs on DC and AC, equipment bonding continuity — IEC 62305, IEEE 142
Anti-islanding function test, IEEE 1547-2018 FRT settings, reactive power capability, revenue meter calibration, protection relay testing — IEEE 1547
Efficiency within 1% of rated, fault code check, firmware currency, combiner box fuse ratings, string monitoring — IEC 61683, IEC 62548
Racking torque verification, foundation wind/snow load compliance, tracker stow function, corrosion protection — ASCE 7, IBC
5-minute data acquisition, irradiance sensor calibration, SCADA cybersecurity (NERC CIP), revenue meter reconciliation — IEC 61724
3m vegetation clearance around electrical equipment, AFCI compliance (NEC 690.11), emergency response plan with AHJ, site maps — IFC, NFPA 1
SWPPP currency, erosion controls, transformer oil containment (EPA SPCC), module disposal compliance — EPA NPDES
2.4m perimeter fencing, hardened locks, security signage, copper theft prevention, CCTV coverage — Best practice, Insurance
As-built single-line diagrams, operating permits, PPA compliance reporting, warranty tracking, BCP — Best practice
A structured 6-step workflow that takes you from initial site setup through AI-powered analysis to professional PDF delivery.
Create customer profile and site — enter installed capacity (MWp), technology type, commissioning date, and site details
Select applicable domains — all 11 pre-loaded with IEC/NEC standards alignment
Complete 88 checklist items — capture thermal scan photos, IV curve data, and photographic evidence per item
Claude AI analyses all domains — generates risk scores, IEC clause citations, and 4-phase remediation roadmap with cost estimates
Select Full/Executive/Technical format — includes thermal findings and standards evidence package
Deliver report to asset owner, assign remediation actions, schedule follow-up assessment
Anthropic Claude Opus AI integrated throughout—from per-item guidance to executive board reporting with industry-specific standards citations.
C-suite grade narrative covering overall risk posture, key findings, business impact, and urgency calibrated to your industry's operational criticality. Big 5 consulting firm tone.
Per-domain deep-dive with risk assessment, standards gaps with specific clause citations, business impact quantification, and 5 priority actions — generated for each domain with failures.
4-phase plan: Immediate (0–30d), Short-term (31–90d), Medium-term (91–180d), Long-term (181d+)—with cost estimates, owners, timelines, and standards references.
Contextual recommendations for each failing checklist item with specific standard clause citations — available directly from the assessment checklist interface during the site visit.
Your platform is deployed and ready. Start your first assessment in minutes — no setup required, no training needed for the core workflow.